DESIGN QUALITY MONITORING
1. DESING STAGE
(1) TESTING AIRFLOW, AIR PRESSURE AND NOISE AT THE DESIGN STAGE OF FANS AND SHELL TO OPTIMIZE THE PRODUCT FEATURES AND TO SATISFY CUSTOMERS NEEDS.
(2) TESTING LOCKED TEMPERATURE RISE AMBIENT TEMPERATURE 72 HOURS ON/OFF WARMING VERIFICATION AND REVERSE PROTECTION TEST TO VERIFY THE RELIABILITY OF CIRCUIT DESIGN.
(3) THE TESTING INSTRUMENTS AT THIS STAGE ARE
- TEST ITEMS: INSTRIUMENT USED
- AIR FLOW AIR FLOW AND PRESSURE TEST SYSTEM
- AIR PRESSURE AIR FLOW AND PRESSURE TEST SYSTEM
- NOISE LEVEL: ANECHOIC CHAMBER SOUND METTER FFT ANALYSER
- LOCKED TEMPERATURE RISE TEST: POWER SUPPLY, TEMPERATURE RECORDER
- REVERSE PROTECTION TEST: POWER SUPPLY
- AMBIENT TE MP 72 HOURS ON/OFF: POWER SUPPLY
2. TRIAL STAGE
(1) AFTER COMPLETING MOULD TEST QUALITY VERIFICATION AT TRIAL STAGE AGAINST THE DIMENSION OF INJECTION PRODUCTS AND STRUCTURAL STRENGTH OF ASSEMBLED PRODUCTS.
(2) THE TEST ITEMS AND INSTRUMENTS USED IN THIS STAGE ARE F0LLOWING:
- TEST ITEMS: INSTRIUMENT USED
- AIR VOLUME: AIRFLOW AND AIR PRESSURE TESTING SYSTEM
- STATIC PRESSURE: AIRFLOW AND AIR PRESSURE TESTING SYSTEM
- NOISE: ANECHOIC CHAMBER SOUND METTER FFT ANALYSER
- IMPELLER BALANCE: MICROPROCESSOR BALNCER
- FRAME STRENGHT: POWER SUPPLY PUSH-PULL GAUGE
- ROTOR PULL-OFF FORCE: PUSH-PULL GAUGE
- SHELL RIB PRESSURE RESISTANCE: PUSH-PULL GAUGE
- RUNING TEST AT HIGH TEMPERATURE: TEMP & HUMIDITY CHAMBER POWER SUPPLY
- FAN MODULAR VIBRATION TEST: VIBRATION TESTER (CONTRACTED OUT)
- FAN MODULAR SHOCK TEST: SHOCK TESTER (CONTRACTED OUT)
3. PILOT STAGE
(1) TESTING AIRFLOW, AIR PRESSURE AND NOISE AT THE DESIGN STAGE OF FANS AND SHELL TO OPTIMIZE THE PRODUCT FEATURES AND TO SATISFY CUSTOMERS NEEDS.
(2) TESTING LOCKED TEMPERATURE RISE AMBIENT TEMPERATURE 72 HOURS ON/OFF WARMING VERIFICATION AND REVERSE PROTECTION TEST TO VERIFY THE RELIABILITY OF CIRCUIT DESIGN.
(3) THE TESTING INSTRUMENTS AT THIS STAGE ARE
- TEST ITEMS: INSTRIUMENT USED
- SPEED: POWER SUPPLY RPM METTER
- CURRENT: POWER SUPPLY
- BURN IN 24 HRS AT AMBIENT TEMP: POWER SUPPLY RPM METTER
4. MEAN TIME TO FAILURE OF COOLING FAN
1. EXPRESSION OF RELIABILITY
(1) TESTING AIRFLOW, AIR PRESSURE AND NOISE AT THE DESIGN STAGE OF FANS AND SHELL TO OPTIMIZE THE PRODUCT FEATURES AND TO SATISFY CUSTOMERS NEEDS.
(2) TESTING LOCKED TEMPERATURE RISE AMBIENT TEMPERATURE 72 HOURS ON/OFF WARMING VERIFICATION AND REVERSE PROTECTION TEST TO VERIFY THE RELIABILITY OF CIRCUIT DESIGN.
(3) THE TESTING INSTRUMENTS AT THIS STAGE ARE
1. ESTIMATE OF MTTF
(1) TESTING AIRFLOW, AIR PRESSURE AND NOISE AT THE DESIGN STAGE OF FANS AND SHELL TO OPTIMIZE THE PRODUCT FEATURES AND TO SATISFY CUSTOMERS NEEDS.
(2) TESTING LOCKED TEMPERATURE RISE AMBIENT TEMPERATURE 72 HOURS ON/OFF WARMING VERIFICATION AND REVERSE PROTECTION TEST TO VERIFY THE RELIABILITY OF CIRCUIT DESIGN.
(3) THE TESTING INSTRUMENTS AT THIS STAGE ARE